We add Stability to vision

The fascination of beautiful buildings and the challenge of making them a reality. Get to know our philisophy.

To philisophy

companys of Woschitz Group

About the Woschitz Group

To Woschitz Group

2ND PLACE WON AT REUSE CHALLENGE

On October 15th, 2020 Energie Burgendland selected the winners of the “ReUse Challenge”. We, the Woschitz Engineering, won the 2nd place in the Challenge.

To news



HoHo Vienna – Wooden tower

The world's highest timber skyscraper and his facade that reflects the shape of a tree bark, reminds us of huge wooden blocks.

Zum Projekt

Pressemeldung

From virtual model to real object.

Zum Presseraum

About us
Dr. Richard Woschitz


B61a Overhead bridge family with free-formwork

The bridges free-form could be implemented only by using Building Information Modeling.

Zum Projekt

News

On October 15th, 2020 Energie Burgendland selected the winners of the "ReUse Challenge". We, the Woschitz Engineering, won the 2nd place in the Challenge.

Mehr

We add stability to vision.

We add stability to vision.

More

Pressemeldung

From virtual model to real object.

Zum Presseraum

About us
Dr. Richard Woschitz


Symbiosis with the architecture

There is only one thing that is even more beautiful for us than beautiful buildings, namely to contribute to its development and implementation. Exactly this is what we love to do with enthusiasm, creativity and determination.

The philosophy

News

On October 15th, 2020 Energie Burgendland selected the winners of the "ReUse Challenge". We, the Woschitz Engineering, won the 2nd place in the Challenge.

Mehr

Structural Engineering

We create out of various materials such as reinforced concrete, steel or wood structures that meets both technical and design specifications.

Mehr

Pressemeldung

From virtual model to real object.

Zum Presseraum

Leistung
Energydesign


Building Physics

Our solution capability in the area of physics includes not only thermal issues, but also the sound insulation and fire protection.

Mehr

News

On October 15th, 2020 Energie Burgendland selected the winners of the "ReUse Challenge". We, the Woschitz Engineering, won the 2nd place in the Challenge.

Mehr

Sports and culture hall Neutal

In Neutal, Burgenland, a new sports and culture hall with a length of 37 meters and a width of 18 meters was built. Except for a lateral extension made of concrete, the entire structure was built of wood.

Zum Projekt

Pressemeldung

From virtual model to real object.

Zum Presseraum

Projekt
Open Elementary School Christian-Bucher-Gasse


Residential complex Floridusgasse

The new construction of the residential development Mühlschüttelgasse in 1210 Vienna was implemented with Liv Immobilienvermarktung GmbH as the client.

Zum Projekt

News

On October 15th, 2020 Energie Burgendland selected the winners of the "ReUse Challenge". We, the Woschitz Engineering, won the 2nd place in the Challenge.

Mehr