Timber Construction Forum Baden-Württemberg

Previous Next Timber Construction Forum Baden-Württemberg Online seminar: Forum Auf Holz Bauen 2022 Planners, institutions and authorities, contractors and experts come together online here The latest trends, projects and current framework conditions in timber construction were presented Matthias Rinnhofer and Christoph Bauer, employees of the Woschitz Group , presented the HoHo Vienna and HAUT Amsterdam Subsequent panel discussion: “Timber construction without borders? Where… Continue reading Holzbauforum Baden-Württemberg

Cycle path bridge made of wind turbines

Previous slide Next slide Cycle path bridge made of wind turbines Wind turbine blades as load-bearing elements of bridges Load capacity of 150 tons Read more here. Back ReUse Wings 2 Videos ReUse Wings 0 0:10 ReUse Wings 1 0:10

DSL³ Eisenstadt

Back Previous slide Next slide DSL³ Eisenstadt New laboratory and research building "Informatikum" for FH Campus in Eisenstadt Modern and future-oriented object in wooden construction Ground floor: meeting rooms, the cube for research work, Fab Lab, workbench with workstations Upper floor: office space Research activities: cloud computing, Internet of Things, Industry 4.0, energy systems of the future Services: local construction supervision construction and technical… Continue reading DSL³ Eisenstadt

BRG Sillgasse Innsbruck

Back Previous slide Next slide BRG Sillgasse Innsbruck New building Three components Inner courtyard Gross floor area: 12,160 m² BIM project Middle component: Main entrance, central staircase, library, administration, special teaching rooms, student laboratory Side components: Dining room, connectable multi-purpose rooms, classrooms, open learning zones, terrace, open-air classroom for urban gardening Basement: Two sports halls, building services center, storage rooms Services: Building physics Client: BIG Bundesimmobiliengesellschaft mbH Architecture: SOLID architecture ZT… Continue reading BRG Sillgasse Innsbruck

EZE office tower topping-out ceremony

Previous Next Topping-out ceremony for the office tower at the EZE 23.06.2022 The topping-out ceremony took place New office tower is being built on the site of the Eisenstadt shopping center 2,500 square meters of usable space, five floors and an underground car park Climate-neutral: equipped with photovoltaic systems, sustainable technologies, e-charging stations, green outdoor area Completion planned for 2023 Architecture: Kaltenbacher Architektur ZT GmbH On site: MD Matthias Zachs, MD Günter Buchinger, architects: Peter… Continue reading Gleichenfeier Büroturm EZE

PKZ Zurndorf topping-out ceremony

Previous Next Topping-out ceremony for nursing competence center Zurndorf June 23, 2022 Realization by the project partners of the state of Burgenland, the municipality of Zurndorf, the Burgenland Samaritan Association and the Oberwarter settlement cooperative a house of the 4th generation 40 new jobs will be created On site: President BGLD ASB BR aD Johann Grillenberger, BGLD ASB BR Günter Kovacs , LRin Mag. Daniela Winkler, KommR. dr Alfred Kollar, Ing. Rainer Hans Wallner, Mag.… Continue reading Gleichenfeier PKZ Zurndorf

Topping-out ceremony Vienna Museum

Previous Next Topping-out ceremony Vienna Museum Topping-out ceremony took place after 2 years of construction Upper floor finished Roof covered Facade stones will be installed in the coming months Services: Accompanying control, structural planning Back

Topping-out ceremony in the Draßmarkt community centre

Previous Next Topping-out ceremony for the Draßmarkt community center New community center for the Draßmarkt community, Burgenland On site: Mayor Anton Wiedenhofer and Deputy Mayor Alois Bader, Member of the Landtag Elisabeth Trummer, Member of the Landtag Patrik Fazekas, Architect Hans-Peter Halbritter, Anton Mittelmeier, Managing Director Neue Eisenstädter; Builder Frank Pfnier, Barbara Katter, Werner Gschirtz, Walter Pichler, Office Manager Woschitz Engineering. Basement: Municipal administration, two medical practices, a rehearsal room for the music club... Continue reading Gleichenfeier Gemeindezentrum Draßmarkt

Opening of the Mattersburg cultural center

Previous Next Opening of the Mattersburg Cultural Center 05/22/2022 Reopening of the KUZ Mattersburg 05/22/1976 First opening, closure followed in 2014 Listed monument renovated and expanded by € 21.8 million Area 4,750 m² Total capacity up to 700 people Services: Local building supervision, technical building supervision TGA © Landesimmobilien Burgenland Return

Ideas competition HTL Pinkafeld

Previous slide Next slide Ideas competition HTL Pinkafeld Idea: Platforms and viewing points for the railway embankment cycle path Challenge: The structure should be connected to the embankment shape of the route and at the same time be an observation tower Awards: Mushroom by Lukas Unger The Proper Mountain by Fabian Tatzgern Developing Frames by Rainer Glavanovits Jury: AV Prof. Ing. Dipl.-Ing. Ulrike Hartler (Head of Department HTL… Continue reading Ideen Wettbewerb HTL Pinkafeld

en_GB