Pferd 15B1 Vorgartenstrasse - Woschitz Group

PFERD 15B1 Vorgartenstrasse

The construction project includes the construction of a 5-storey extension to the elementary school and Hort Vorgartenstraße with 6 classrooms and 7 group rooms and adjoining rooms, the construction of a kitchen with bistro, a studio, a gymnasium and the direct connection through a closed passage to the existing building.

The extension was completely built with basement, basement and ground floor were built in solid reinforced concrete. The staircase core was made of pre-fabricated reinforced concrete. The gymnasium with adjoining rooms is located in the basement. The upper floors 1 to 4 were built in timber construction, the outer walls were created both in timber frame construction as well as in solid wood construction. The extension was provided with a warm roof and the escape stairs made of steel structures. Accessibility has been achieved through the construction of an elevator and heating is provided by district heating. A closed passageway leads to the main building.

The project is part of a series of compulsory school expansion programs throughout Vienna, most of which are made from prefabricated modules made of wood, implemented by the WIP in close coordination with the MA 56. The school was built during operation with low noise pollution. The rapid construction time of only 5 months was made possible by the high degree of prefabrication of the wood elements made of CLT (solid cross-laminated wood laminate boards).

This project was implemented by RWT plus and Woschitz Engineering, which are members of the WOSCHITZ GROUP.

Photos © C. Woschitz

Information zu Projekt:

Location
1020 Wien, Vorgartenstrasse 208
Client
Magistratsabteilung 56 vertreten durch WIP Wiener Infrastruktur Projekt GmbH
Architecture
Architekturbüro DI Michael Schluder
General planner
Ing. W.P. Handler Bau GesmbH
Period
3/2015 - 8/2015
Leistungen
Structural Engineering, Building Physics, Energydesign

Umgesetzt mit:

  • RWT Plus
  • Woschitz Engineering