EZE office tower topping-out ceremony

Previous Next Topping-out ceremony for the office tower at the EZE 23.06.2022 The topping-out ceremony took place New office tower is being built on the site of the Eisenstadt shopping center 2,500 square meters of usable space, five floors and an underground car park Climate-neutral: equipped with photovoltaic systems, sustainable technologies, e-charging stations, green outdoor area Completion planned for 2023 Architecture: Kaltenbacher Architektur ZT GmbH On site: MD Matthias Zachs, MD Günter Buchinger, architects: Peter… Continue reading Gleichenfeier Büroturm EZE

PKZ Zurndorf topping-out ceremony

Previous Next Topping-out ceremony for nursing competence center Zurndorf June 23, 2022 Realization by the project partners of the state of Burgenland, the municipality of Zurndorf, the Burgenland Samaritan Association and the Oberwarter settlement cooperative a house of the 4th generation 40 new jobs will be created On site: President BGLD ASB BR aD Johann Grillenberger, BGLD ASB BR Günter Kovacs , LRin Mag. Daniela Winkler, KommR. dr Alfred Kollar, Ing. Rainer Hans Wallner, Mag.… Continue reading Gleichenfeier PKZ Zurndorf

Topping-out ceremony Vienna Museum

Previous Next Topping-out ceremony Vienna Museum Topping-out ceremony took place after 2 years of construction Upper floor finished Roof covered Facade stones will be installed in the coming months Services: Accompanying control, structural planning Back

Topping-out ceremony in the Draßmarkt community centre

Previous Next Topping-out ceremony for the Draßmarkt community center New community center for the Draßmarkt community, Burgenland On site: Mayor Anton Wiedenhofer and Deputy Mayor Alois Bader, Member of the Landtag Elisabeth Trummer, Member of the Landtag Patrik Fazekas, Architect Hans-Peter Halbritter, Anton Mittelmeier, Managing Director Neue Eisenstädter; Builder Frank Pfnier, Barbara Katter, Werner Gschirtz, Walter Pichler, Office Manager Woschitz Engineering. Basement: Municipal administration, two medical practices, a rehearsal room for the music club... Continue reading Gleichenfeier Gemeindezentrum Draßmarkt

Opening of the Mattersburg cultural center

Previous Next Opening of the Mattersburg Cultural Center 05/22/2022 Reopening of the KUZ Mattersburg 05/22/1976 First opening, closure followed in 2014 Listed monument renovated and expanded by € 21.8 million Area 4,750 m² Total capacity up to 700 people Services: Local building supervision, technical building supervision TGA © Landesimmobilien Burgenland Return

Ideas competition HTL Pinkafeld

Previous slide Next slide Ideas competition HTL Pinkafeld Idea: Platforms and viewing points for the railway embankment cycle path Challenge: The structure should be connected to the embankment shape of the route and at the same time be an observation tower Awards: Mushroom by Lukas Unger The Proper Mountain by Fabian Tatzgern Developing Frames by Rainer Glavanovits Jury: AV Prof. Ing. Dipl.-Ing. Ulrike Hartler (Head of Department HTL… Continue reading Ideen Wettbewerb HTL Pinkafeld

Building and Spatial Planning Day

Previous Next Building and Regional Planning Day How fit are we for the future? CEO Richard Woschitz presented this topic together with Ing. Reinhold Kunze with the lecture "Sustainable building with the legal requirements and challenges in practice" on the building and regional planning day on May 12 in Vienna. © ÖWAV Back

ÖGNB – Awarded Buildings 2022

Previous Next ÖGNB – Outstanding (Viennese) building 2022 Austrian Sustainable Building Council 4 awards achieved: 2x gold, 1x silver, 1x bronze HoHo Vienna ÖGNB gold 924 out of 1000 ÖGNB points Client: Development Baufeld Delta GmbH Architecture: Rüdiger Lainer+Partner Architekten ZT GmbH building technology: Dr. Ronald Mischek ZT GmbH Building physics + structural design: RWT plus ZT GmbH… Continue reading ÖGNB – Ausgezeichnete Gebäude 2022

Opening of DSL²

Previous Next Opening DSL² April 27th, 2022 Opening of the computer center On site: GF-FH Burgenland Georg Pehm, member of the supervisory board Christian Büll, member of the supervisory board Ingrid Puschautz-Meidl, mayor Thomas Steiner, provincial councilor Leonhard Schneemann, vice-mayor Otto Kropf, GF-Research Burgenland Marcus Keding, chairman of the supervisory board Gabriele Ambros, Member of the Supervisory Board Eva Schachinger Area 650m² all wood construction "Smart Computing Continuum", "Energy Transition" and "Sustainable Innovation" Architect: Gerald Prenner Services:… Continue reading Eröffnung DSL²

Topping-out ceremony Seehotel Weiden

Previous Next Topping-out ceremony Seehotel Weiden 04/21/2022 Topping-out ceremony Hotel name "Nils am See" "Nils" stands for natural, individual, casual and stylish planned opening of the hotel: Easter 2023 25 new jobs, 63 rooms and 120 beds green wooden facade and independent of fossil fuels Area: 1,550 m² Service: Structural engineering, Woschitz Engineering Back

en_GB